Concrete vaults under the parking lot at Driftwood State Beach where subsea cables connected to the wave energy test site arrive on land and connect to land cables in Newport, Ore., Friday, Aug. 23, 2024. (AP Photo/Craig Mitchelldyer)
Copyright © 2024 Yahoo Inc. All rights reserved.